Exclusive Module — Quality Control & ISO Compliance

Quality Control Module — An Inspection Point at Every Stage, Documented for the Auditor

Inspection points on the line, ISO 9001 and 22000 standards, quality tests and certificates, non-conformance reports, corrective and preventive actions, raw-material and finished-goods traceability, and supplier quality scoring.

Problems We Solve

Are These Problems Hurting Your Business?

Inspections recorded on paper

Forms in binders — and at audit time they turn out to be incomplete

Defects surface after delivery

The product reaches the customer and comes back as a return, at double the cost

No way to trace a defect to its source

A bad raw-material lot entered production and nobody can say which orders it touched

No objective supplier rating

You keep buying from a supplier who ships defects because no number proves it

Solutions

How Hunt ERP Solves These

1

Inspection points at material receipt, in process, and before delivery

2

A quality plan per product: required characteristics, upper and lower limits, measurement method

3

Ready standards aligned to ISO 9001 and ISO 22000, fully customizable

4

Lab tests with results, attachments and sample photos

5

Non-conformance reports: description, root cause, affected quantity, disposition (rework, sort, reject, concession)

6

Corrective and preventive actions with an owner, due date and closure follow-up

7

Full lot and serial traceability: from the raw-material lot to the customer who received it, and back

8

Quarantine for suspect stock — defective goods cannot be issued

9

Certificate of analysis printed with the shipment

10

Numeric supplier quality scoring: conformance rate, NCR count, and its weight in purchasing decisions

11

An audit trail on every change — who changed what and when

Modules

Industry-Specific Modules

Everything you need in one integrated system

Inspection Points
Incoming Inspection
In-Process Inspection
Final Inspection
Quality Plan
Acceptance Limits
Lab Tests
Sample Photos
ISO 9001
ISO 22000
NCR Reports
Root Cause
Disposition
CAPA
Closure Tracking
Lot Traceability
Serial Traceability
Quarantine
Certificate of Analysis
Rework
Supplier Scoring
Conformance Rate
Audit Trail
Quality Reports
Cost of Quality
FAQ

Frequently Asked Questions

Does it help with ISO certification?
It produces the records an auditor asks for: quality plans, inspection records, NCRs, CAPAs and the audit trail. The certificate itself comes from a certifying body, but the documentation is ready.
Does it suit a food factory?
Yes — expiry dates, lot traceability, quarantine and ISO 22000 standards are all there, which is essential in food and pharma.
Can I find who received a defective product?
Yes. Traceability runs both ways: from a material lot to every order and customer it reached, and from a customer complaint back to the lot and its supplier.
Is it connected to production and inventory?
Yes, inspection points sit inside the manufacturing cycle, and rejected goods are quarantined so they never count as available stock.

Ready to Apply Hunt ERP to Your Business?

Book a free demo or contact our sales team for a custom quote tailored to your industry